-Previous Recordings
For anyone who has missed a day of filming or looking to see a specific segment I will be posting links to the YouTube videos here on this page!
1992 ACS BMW Recordings!
- Jan 1st – No recording (testing day)
- Jan 2nd – Part 1 (UUC Brake Line Installation) Part 2 (Side Skirt Removal)
- Jan 3rd – Part 1 (Body Work Beginning)
- Jan 4th – Part 1 (Body Work)
- Jan 5th – Part 1 Part 2 (Side Skirt work)
- Jan 6th – Part 1 (Body Work)
- Jan 7th – Part 1 (Dent and Rust Repair)
- Jan 8th – Part 1 (Side Skirt Re-installation)
- Jan 9th – Part 1 (Ustream Error) Part 2 (Body Work)
- Jan 10th – Part 1 Part 2 (Body work and Molding Prep)
- Jan 11th – Part 1 Part 2 (Final Body work / Side Skirt)
- Jan 12th – Part 1 Part 2 (Masking and Primer)
- Jan 13th – Part 1 Part 2 Part 3 Part 4 (Final Sanding and Prep)
- Jan 14th – Part 1 Part 2 (Final Prep and Base Coat Spraying)
- Jan 15th – Part 1 (Spraying Clear Coat) Part 2 (Unmasking the Car)
- Jan 16th – Part 1 (Stock Cam Out) Part 2 (M3 Cam Prep) Part 3 (M3 Cam Install) Part 4 (Clean Up)
- Jan 17rh – Part 1 (Door Panel Insert Dyeing + Moldings Prime)
- Jan 18th – Part1 (Wheel Masking) Part 2 (Painting of Door Moldings and Rims + Goods Delivery)
- Jan 19th – Part 1 (Molding, Wheels and Door Panel Installation)
- Jan 20th – Part 1 (Midpipe and Exhaust Manifold Removal)
- Jan 21st – Part 1 (M3 Lip and White Face Gauge Install)
- Jan 22nd – Part 1 (Seat and Floor Repair)
- Jan 23nd – Part 1 (Header Install) Part 2 ( 3″ Midpipe Install)
- Jan 24th – Part 1 (Audio Install) Part 2 (Brake Bleeding) *BONUS Exhaust Clip
- March 3rd – Part 1 (HID, Strut Bar & CAI Installation)
- March 4th – Part 1 (Stereo Installation & Parking/Headlight Mod)
- March 5th – Part 1 (Misc Clean Up)
- March 6th – Part 1 (Mirror and Kidney Install) Part 2 (Headlights Installed)
1987 Mustang GT Convertible Recordings!
- Jan 25th – Part 1 (No Mustang Disappointment)
- Jan 26th – Part 1 (Mustang Introduction and Tear Down)
- Jan 27th – Part 1 (Armrest Repair, Block Sanding) Part 2 (Block Sanding and Bumper repair)
- Jan 28th – Part 1 (Front Bumper final and Primer + Engine Bay Prep)
- Jan 29th – Part 1 (Block sanded primer, Prepped Wing and Introduced the Vortech)
- Jan 30th – Part 1 (Vortech Supercharger Installation, Harness and Intake removal)
- Feb 1st – Part 1 (UPR Powerpipe, Vortech Install and Custom Gas Door)
- Feb 2nd – Part 1 (Door Jam prep, Belts and DECH Grabbers Talk)
- Feb 3rd – Part 1 (More Prep and Stop-By from Peterborough Powdercoating)
- Feb 4th – Part 1 (Supercharger and Accessory removal, Trim Prep)
- Feb 5th – Part 1 (Vendor Rant and Accessory clean up)
- Feb 6th – Part 1 (Trim Primer, Engine Paint) Part 2 (Fender Rolling) Part 3 (Trim Paint & Suspension)
- Feb 8th – Part 1 (Clean up & Masking)
- Feb 9th – Part 1 (Pre-Paint Prep)
- Feb 10th – Part 1 (Final Prep) Part 2 (Paint and Satin Clear)
- Feb 11th – Part 1 (Mustang Paint Revealed and Trim Re-install)
- Feb 12th – Part 1 (Nut and Bolt Detail, Paint and Install)
- Feb 13th – Part 1 (Box Opening) Part 2 (Misc Assembly)
- Feb 16th – Part 1 (Rear Disc Brake / 5 Bolt Conversion)
- Feb 17th – Part 1 (Rear Disc Mock Up and Drivers Door re-clear coat)
- Feb 18th – Part 1 (Rear Disc Brake Completion and Engine Accessory Install)
- Feb 19th – Part 1 (Brake Like Flaring and Proportioning Valve Gutting)
- Feb 20th – Part 1 (Drop Spindles) Part 2 (Wet Sand) Part 3 (Rear Suspension) Part 4 (LOW!!!!)
- Feb 22nd – Part 1 (Wiring Harness Clean-up / Door Panel Install)
- Feb 23rd – Part 1 (Engine Wiring Harness Installation and Computer)
- Feb 24th – Part 1 (Engine wrap up and Fired! sorry for the black and white)
- Feb 25th – Part 1 (Brake Flaring and Master Cylinder Bench Bleed)
- Feb 26th – Part 1 (Proportioning Valve and Master Install) Part 2 (Diff fluid and Brake Bleed)
- Feb 27th – Part 1 (Door Popper Install _ Engine Fire) Part 2 (Misc Clean Up)
- March 1st – Part 1 (Spring Modification)
- March 2nd – Part 1 (Mustang Completion)